| 9931827 |
Structural repair having optical witness and method of monitoring repair performance |
Gary E. Georgeson, Kenneth H. Griess, Russell L. Keller |
2018-04-03 |
$39,375,000 |
| 9604419 |
Oblong configuration for bonded patch |
Eugene A. Dan-Jumbo, Russell L. Keller |
2017-03-28 |
$15,023,000 |
| 9393768 |
Discretely tailored multi-zone bondline for fail-safe structural repair |
Eugene A. Dan-Jumbo, Russell L. Keller |
2016-07-19 |
$16,477,000 |
| 9393651 |
Bonded patch having multiple zones of fracture toughness |
Eugene A. Dan-Jumbo, Russell L. Keller |
2016-07-19 |
$16,477,000 |
| 9085052 |
Structural repair having optical witness and method of monitoring repair performance |
Gary E. Georgeson, Kenneth H. Griess, Russell L. Keller |
2015-07-21 |
$20,691,000 |
| 8935286 |
Interactive system for managing parts and information for parts |
Allison Deal, Scott Bridgford |
2015-01-13 |
$23,631,000 |
| 8828515 |
Predictable bonded rework of composite structures using tailored patches |
Eugene A. Dan-Jumbo, Russell L. Keller |
2014-09-09 |
$33,718,000 |
| 8815132 |
Method of configuring a patch body |
Eugene A. Dan-Jumbo, Russell L. Keller |
2014-08-26 |
$22,232,000 |
| 8802213 |
Tapered patch for predictable bonded rework of composite structures |
Eugene A. Dan-Jumbo, Russell L. Keller |
2014-08-12 |
$14,292,000 |
| 8617694 |
Discretely tailored multi-zone bondline for fail-safe structural repair |
Eugene A. Dan-Jumbo, Russell L. Keller |
2013-12-31 |
$20,139,000 |
| 8540909 |
Method of reworking an area of a composite structure containing an inconsistency |
Eugene A. Dan-Jumbo, Russell L. Keller |
2013-09-24 |
$21,280,000 |
| 8524356 |
Bonded patch having multiple zones of fracture toughness |
Eugene A. Dan-Jumbo, Russell L. Keller |
2013-09-03 |
$13,334,000 |
| 8449703 |
Predictable bonded rework of composite structures using tailored patches |
Eugene A. Dan-Jumbo, Russell L. Keller |
2013-05-28 |
$33,124,000 |
| 8409384 |
Predictable bonded rework of composite structures |
Eugene A. Dan-Jumbo, Russell L. Keller |
2013-04-02 |
$17,771,000 |
| 8197623 |
Thermal and vacuum assessment method |
— |
2012-06-12 |
$23,028,000 |
| 8056800 |
Systems and methods for configuration management |
Marc R. Matsen, Brian K. Ramberg, Gloria J. Nickson, David B. Blackwell, Mahesh G. Seetharamu +2 more |
2011-11-15 |
$8,349,000 |
| 7705725 |
Methods and systems for monitoring structures and systems |
Marc R. Matsen, Gary E. Georgeson, Kenneth Porad, Arun Ayyagari, Kevin Y. Ung +2 more |
2010-04-27 |
$23,096,000 |
| 7434480 |
Methods and systems for using active surface coverings for structural assessment and monitoring |
Gary E. Georgeson |
2008-10-14 |
$11,014,000 |
| 7312608 |
Systems and methods for inspecting electrical conductivity in composite materials |
Gary E. Georgeson, Joseph L. Hafenrichter |
2007-12-25 |
|
| 6270603 |
Repair method for uniformly heating composite structure |
Phillip E. Roll |
2001-08-07 |
$108,483,000 |
| 6031212 |
Heating apparatus for composite structure repair |
Phillip E. Roll |
2000-02-29 |
$72,054,000 |
| 5442156 |
Heating apparatus for composite structure repair |
Phillip E. Roll |
1995-08-15 |
$31,809,000 |
| 5279725 |
Apparatus and method for electroplating a workpiece |
— |
1994-01-18 |
$78,127,000 |
| 5271145 |
Rope saw cutting apparatus and method for scarfing composites |
Philip E. Roll |
1993-12-21 |
$77,857,000 |
| 5207541 |
Scarfing apparatus |
Phillip E. Roll |
1993-05-04 |
$23,812,000 |