| 12000273 |
Method and system for performing hydrocarbon operations using communications associated with completions |
Xiaohua Yi, Steven D. Vande Lune |
2024-06-04 |
$520,207,000 |
| 11428079 |
Material control to prevent well plugging |
Charles S. Yeh, Timothy K. Ellison, Tracy J. Moffett, Andy J. Veselka, Elizabeth L. Templeton-Barrett |
2022-08-30 |
$1,618,076,000 |
| 10107093 |
Downhole sand control assembly with flow control and method for completing a wellbore |
Charles S. Yeh, Michael T. Hecker |
2018-10-23 |
$193,189,000 |
| 10012032 |
Downhole flow control, joint assembly and method |
Charles S. Yeh, Michael T. Hecker, Tracy J. Moffett |
2018-07-03 |
$95,025,000 |
| 9816361 |
Downhole sand control assembly with flow control, and method for completing a wellbore |
Charles S. Yeh, Michael T. Hecker |
2017-11-14 |
$60,625,000 |
| 9797226 |
Crossover joint for connecting eccentric flow paths to concentric flow paths |
Charles S. Yeh, Michael T. Hecker, Tracy J. Moffett, Pavlin B. Entchev, Patrick C. Hyde |
2017-10-24 |
$129,352,000 |
| 9725989 |
Sand control screen having improved reliability |
Christian S. Mayer, Charles S. Yeh, David A. Howell, Pavlin B. Entchev, Eric R. Grueschow +6 more |
2017-08-08 |
$121,416,000 |
| 9638012 |
Wellbore apparatus and method for sand control using gravel reserve |
Charles S. Yeh, Michael T. Hecker, Tracy J. Moffett |
2017-05-02 |
$106,897,000 |
| 9593559 |
Fluid filtering device for a wellbore and method for completing a wellbore |
Charles S. Yeh, Tracy J. Moffett, Ted A. Long, Andrey A. Troshko, Michael T. Hecker +8 more |
2017-03-14 |
$95,534,000 |
| 9404348 |
Packer for alternate flow channel gravel packing and method for completing a wellbore |
Charles S. Yeh, Michael T. Hecker, Tracy J. Moffett, Jon Blacklock, David C. Haeberle +5 more |
2016-08-02 |
$313,234,000 |
| 9322248 |
Wellbore apparatus and methods for multi-zone well completion, production and injection |
Charles S. Yeh, Michael T. Hecker, Tracy J. Moffett, Jon Blacklock, David C. Haeberle +5 more |
2016-04-26 |
$74,389,000 |
| 9322253 |
Method for production of hydrocarbons using caverns |
James S. Brown, Daniel P. Leta, Moses Minta, Scott M. Whitney, Paul L. Tanaka |
2016-04-26 |
$74,389,000 |
| 9303485 |
Wellbore apparatus and methods for zonal isolations and flow control |
Michael T. Hecker, Petrus A. J. Stevens, David A. Howell, Charles S. Yeh, Iain MacLeod +3 more |
2016-04-05 |
$146,513,000 |
| 8839861 |
Systems and methods for providing zonal isolation in wells |
Charles S. Yeh, Michael T. Hecker, David C. Haeberle |
2014-09-23 |
$137,457,000 |
| 8789612 |
Open-hole packer for alternate path gravel packing, and method for completing an open-hole wellbore |
David C. Haeberle, Michael T. Hecker |
2014-07-29 |
$372,881,000 |
| 8517098 |
Wellbore method and apparatus for completion, production and injection |
Bruce A. Dale, Charles S. Yeh, Jon Blacklock, Darren F. Rosenbaum, Michael T. Hecker +4 more |
2013-08-27 |
$118,529,000 |
| 8430160 |
Wellbore method and apparatus for completion, production and injection |
Charles S. Yeh, David C. Haeberle, Michael T. Hecker, Jon Blacklock, Ted A. Long +7 more |
2013-04-30 |
$84,298,000 |
| 8403062 |
Wellbore method and apparatus for completion, production and injection |
Bruce A. Dale, Charles S. Yeh, Jon Blacklock, Darren F. Rosenbaum, Michael T. Hecker +3 more |
2013-03-26 |
$203,545,000 |
| 8356664 |
Wellbore method and apparatus for completion, production and injection |
Charles S. Yeh, David C. Haeberle, Michael T. Hecker, Jon Blacklock, Ted A. Long +7 more |
2013-01-22 |
$310,694,000 |
| 8347956 |
Wellbore method and apparatus for completion, production and injection |
Charles S. Yeh, David C. Haeberle, Michael T. Hecker, Jon Blacklock, Ted A. Long +7 more |
2013-01-08 |
$133,798,000 |
| 8286715 |
Coated sleeved oil and gas well production devices |
Jeffrey R. Bailey, Erika Ann Ooten Biediger, Narasimha-Rao Venkata Bangaru, Adnan Ozekcin, Hyun-Woo Jin +5 more |
2012-10-16 |
$157,765,000 |
| 8261841 |
Coated oil and gas well production devices |
Jeffrey R. Bailey, Erika Ann Ooten Biediger, Narasimha-Rao Venkata Bangaru, Adnan Ozekcin, Hyun-Woo Jin +3 more |
2012-09-11 |
$89,729,000 |
| 8215406 |
Wellbore method and apparatus for completion, production and injection |
Bruce A. Dale, Charles S. Yeh, Jon Blacklock, Darren F. Rosenbaum, Michael T. Hecker +3 more |
2012-07-10 |
$177,460,000 |
| 8186429 |
Wellbore method and apparatus for completion, production and injection |
Charles S. Yeh, David C. Haeberle, Michael T. Hecker, Jon Blacklock, Ted A. Long +7 more |
2012-05-29 |
|
| 8127831 |
Wellbore method and apparatus for sand and inflow control during well operations |
David C. Haeberle, Charles S. Yeh, Timothy G. Benish, Michael T. Hecker, Jon Blacklock |
2012-03-06 |
$345,068,000 |