Issued Patents 2020
Showing 1–11 of 11 patents
| Patent # | Title | Co-Inventors | Date |
|---|---|---|---|
| 10876754 | Dynamic central plant control based on load prediction | Michael J. Wenzel | 2020-12-29 |
| 10824125 | Central plant control system based on load prediction through mass storage model | Michael J. Wenzel, Graeme Willmott, Matthew J. Asmus | 2020-11-03 |
| 10778012 | Battery optimization control system with data fusion systems and methods | Radu M. Dorneanu, Michael J. Wenzel, Kirk H. Drees, Andrew J. Przybylski | 2020-09-15 |
| 10739742 | Building energy system with stochastic model predictive control | Ranjeet Kumar, Michael J. Wenzel, Matthew J. Ellis, Kirk H. Drees, Victor Zavala Tejeda | 2020-08-11 |
| 10742055 | Renewable energy system with simultaneous ramp rate control and frequency regulation | Michael J. Wenzel, Brett M. Lenhardt | 2020-08-11 |
| 10732584 | Building energy optimization system with automated and dynamic economic load demand response (ELDR) optimization | Michael J. Wenzel, Matthew J. Asmus, James P. Kummer, Peter A. Craig, Robert D. Turney | 2020-08-04 |
| 10700541 | Power control system with battery power setpoint optimization using one-step-ahead prediction | Michael J. Wenzel, Brett M. Lenhardt | 2020-06-30 |
| 10673380 | Photovoltaic energy system with stationary energy storage control | Michael J. Wenzel, Kirk H. Drees, John I. Ruiz, Matthew J. Ellis, John H. Burroughs +1 more | 2020-06-02 |
| 10594153 | Frequency response optimization control system | Radu M. Dorneanu, Michael J. Wenzel, Kirk H. Drees | 2020-03-17 |
| 10591178 | Frequency response optimization based on a change in battery state-of-charge during a frequency response period | Michael J. Wenzel, Kirk H. Drees | 2020-03-17 |
| 10558180 | Building control system with empirical uncertainty determination for energy use model parameters | Michael J. Wenzel | 2020-02-11 |