Issued Patents All Time
Showing 1–20 of 20 patents
| Patent # | Title | Co-Inventors | Date |
|---|---|---|---|
| 12427555 | Lateral collection grid for landfill gas and method | Delaney Lewis | 2025-09-30 |
| 12316273 | Solar energy system for use with tufted geosynthetics | Michael R. Ayers, Michael Lucini, Gregory Lucini | 2025-05-27 |
| 11031903 | Solar energy system for use with tufted geosynthetics on sloping ground | Michael R. Ayers, Michael Lucini, Gregory Lucini | 2021-06-08 |
| 10742164 | Solar energy system for use with tufted geosynthetics | Michael R. Ayers, Michael Lucini, Gregory Lucini | 2020-08-11 |
| 10689824 | Synthetic ground cover system for erosion protection for use with or without a sand/soil ballast | Michael R. Ayers | 2020-06-23 |
| 10661318 | Process and container for solidification and disposal of liquid waste | William Delaney Lewis | 2020-05-26 |
| 10581374 | Solar energy system for use with tufted geosynthetics | Michael R. Ayers, Michael Lucini, Gregory Lucini | 2020-03-03 |
| D863762 | Receiver for tape knife and excess compound | — | 2019-10-22 |
| 10166579 | Gas vent with low-pressure relief valve for landfills | Delaney Lewis, Michael R. Ayers | 2019-01-01 |
| 9863100 | Methods for joining strips of synthetic turf by blade-to-loop tuft bonding and for covering a site with synthetic turf | Delaney Lewis, Michael R. Ayers | 2018-01-09 |
| 9587367 | Synthetic grass cover for MSE walls | Michael R. Ayers | 2017-03-07 |
| 9587364 | Synthetic ground cover system with impermeable backing and binding infill for erosion control | Michael R. Ayers | 2017-03-07 |
| 9387525 | Near-surface natural gas collection manifold | Delaney Lewis, Michael R. Ayers | 2016-07-12 |
| 9375766 | Near-surface wellhead for extracting natural gas | Michael R. Ayers, Delaney Lewis | 2016-06-28 |
| 9267231 | Methods for joining strips of synthetic turf and for covering a site with synthetic turf | Delaney Lewis, Michael R. Ayers | 2016-02-23 |
| 9199287 | Valveless passive gas vent for landfills | Delaney Lewis, Michael R. Ayers | 2015-12-01 |
| 9163375 | Synthetic ground cover system with binding infill for erosion control | Michael R. Ayers | 2015-10-20 |
| 8585322 | Cover system with gas collection system for waste sites and environmental closures | Michael R. Ayers | 2013-11-19 |
| 8403597 | Cover system for waste sites | Michael R. Ayers | 2013-03-26 |
| 7682105 | Cover system for waste sites and environmental closures | Michael R. Ayers | 2010-03-23 |