Issued Patents All Time
Showing 1–19 of 19 patents
| Patent # | Title | Co-Inventors | Date |
|---|---|---|---|
| 12228010 | Eutectic alloy system for casing-casing annulus cement repair | Amjad Alshaarawi, Zahrah Marhoon, Abdullah Atiyah, Thomas Heinold, Peter Ido Egbe +1 more | 2025-02-18 |
| 12000227 | Untethered near-wellbore stimulation | Saad AlMutairi, Fahd Ibrahim Alghunaimi | 2024-06-04 |
| 11821289 | Automated production optimization technique for smart well completions using real-time nodal analysis | Amer Alanazi, Abdulaziz S. Al-Qasim | 2023-11-21 |
| D975107 | Portion of a display screen with graphical user interface | Amer Alanazi, Abdulaziz S. Al-Qasim | 2023-01-10 |
| 11499423 | Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibration | Amer Alanazi, Abdulaziz S. Al-Qasim | 2022-11-15 |
| 11441395 | Automated production optimization technique for smart well completions using real-time nodal analysis including real-time modeling | Amer Alanazi, Abdulaziz S. Al-Qasim | 2022-09-13 |
| 11326423 | Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settings | Amer Alanazi, Abdulaziz S. Al-Qasim | 2022-05-10 |
| 11002093 | Semi-autonomous downhole taxi with fiber optic communication | Brett W. Bouldin, Robert John Turner | 2021-05-11 |
| 10947811 | Systems and methods for pipe concentricity, zonal isolation, and stuck pipe prevention | Abdulaziz S. Al-Qasim | 2021-03-16 |
| 10908007 | Multiphase flow metering system for horizontal well compartments | Brett W. Bouldin, Robert John Turner, Moataz Abu AlSaud | 2021-02-02 |
| 10890067 | Method to use a buoyant body to measure two-phase flow in horizontal wells | Brett W. Bouldin, Rob Turner | 2021-01-12 |
| 10883810 | Subterranean well torpedo system | Brett W. Bouldin, Robert John Turner, Andrey Bakulin, Michael Jervis | 2021-01-05 |
| 10571590 | Electrical submersible pump monitoring and failure prediction | Mohamed Nabil Noui-Mehidi | 2020-02-25 |
| 10557317 | Systems and methods for pipe concentricity, zonal isolation, and stuck pipe prevention | Abdulaziz S. Al-Qasim | 2020-02-11 |
| 10429533 | Electrical submersible pump monitoring and failure prediction | Mohamed Nabil Noui-Mehidi | 2019-10-01 |
| 10330811 | Electrical submersible pump monitoring and failure prediction | Mohamed Nabil Noui-Mehidi | 2019-06-25 |
| 10310128 | Electrical submersible pump monitoring and failure prediction | Mohamed Nabil Noui-Mehidi | 2019-06-04 |
| 10288760 | Electrical submersible pump monitoring and failure prediction | Mohamed Nabil Noui-Mehidi | 2019-05-14 |
| 8613311 | Apparatus and methods for well completion design to avoid erosion and high friction loss for power cable deployed electric submersible pump systems | Jinjiang Xiao, Mohamed Nabil Noui-Mehidi | 2013-12-24 |