| 12491391 |
High voltage cable routing for electrified vehicle |
Eric R. Linsmeier, Chad Radtke, Tim Nelson, Seth Newlin, David Kay |
2025-12-09 |
|
| 12442159 |
Coordinated motion system and method |
Eric R. Linsmeier, Korry D. Kobel, Fredric L. Yutzy |
2025-10-14 |
|
| 12384328 |
Response vehicle systems and methods |
Neil Bjornstad, Michael J. Holeton, Patrick D. Martin |
2025-08-12 |
|
| 12378102 |
Support structure for a ladder assembly of a fire apparatus |
Don Parshall, Eric D. Betz, Jon J. Morrow, Peter K. Kramer, Troy D. Lind |
2025-08-05 |
|
| 12351180 |
Systems and methods for response vehicle pump control |
Eric R. Linsmeier, Brian Piller, Chad T. Dolphin |
2025-07-08 |
|
| 12318643 |
Stability system for a fire apparatus |
Eric D. Betz |
2025-06-03 |
|
| 12234135 |
Fire apparatus |
Don Parshall, Eric D. Betz, Eric R. Linsmeier, Jennifer L. Bloemer, Jeffrey D. Aiken +4 more |
2025-02-25 |
|
| 12227144 |
Automatic vehicle braking in response to operator egress |
Neil Bjornstad, Michael J. Holeton, Patrick D. Martin |
2025-02-18 |
|
| 12187282 |
Condition based vehicle performance management |
Paul Baierl, Jeromie Johnston, Eric R. Linsmeier, Jonathan Ropella |
2025-01-07 |
|
| 12159986 |
Systems and methods for battery thermal management on a vehicle |
Eric R. Linsmeier, David Fieber, John Schultz, Jason Shively, Bob Schulz +1 more |
2024-12-03 |
$14,064,000 |
| 12155049 |
Systems and methods for battery thermal management on a vehicle |
Eric R. Linsmeier, David Fieber, John Schultz, Jason Shively, Bob Schulz |
2024-11-26 |
$8,483,000 |
| 12122648 |
Mid-mount fire apparatus |
Eric D. Betz |
2024-10-22 |
$6,494,000 |
| 12092116 |
Fluid delivery system health monitoring systems and methods |
Eric R. Linsmeier, John D. Woelfel |
2024-09-17 |
$5,053,000 |
| 12049190 |
Response vehicle systems and methods |
Neil Bjornstad, Michael J. Holeton, Patrick D. Martin |
2024-07-30 |
$12,103,000 |
| 12024138 |
Leaning control scheme for a fire apparatus |
Eric D. Betz |
2024-07-02 |
$18,540,000 |
| 12017705 |
Stay arm for a vehicle cab |
— |
2024-06-25 |
$7,176,000 |
| 11958449 |
Fire apparatus level indication system |
Eric R. Linsmeier |
2024-04-16 |
$42,220,000 |
| 11946319 |
Load transfer stations |
Eric D. Betz |
2024-04-02 |
$16,194,000 |
| 11850456 |
Aerial configuration for a mid-mount fire apparatus |
Eric D. Betz |
2023-12-26 |
$14,740,000 |
| 11851036 |
Integrated ground pad |
Todd Burkard |
2023-12-26 |
$14,740,000 |
| 11795043 |
Mid-mount fire apparatus |
Eric D. Betz |
2023-10-24 |
$9,163,000 |
| 11691599 |
Leaning control scheme for a fire apparatus |
Eric D. Betz |
2023-07-04 |
|
| 11638845 |
Stability system for a fire apparatus |
Eric D. Betz |
2023-05-02 |
$13,697,000 |
| 11634141 |
Systems and methods for response vehicle pump control |
Eric R. Linsmeier, Brian Piller, Chad T. Dolphin |
2023-04-25 |
$9,177,000 |
| 11577689 |
Response vehicle systems and methods |
Neil Bjornstad, Michael J. Holeton, Patrick D. Martin |
2023-02-14 |
$34,317,000 |