Issued Patents All Time
Showing 1–25 of 25 patents
| Patent # | Title | Co-Inventors | Date |
|---|---|---|---|
| 11527889 | Congestion control in electric power system under load and uncertainty | Dung Phan | 2022-12-13 |
| 11181564 | Distributed control of electric power grids | Dung Phan, Xu Sun | 2021-11-23 |
| 10816942 | Managing time-substitutable electricity usage using dynamic controls | Jonathan R. Hosking, Ramesh Natarajan, Shivaram Subramanian, Xiaoxuan Zhang | 2020-10-27 |
| 10628838 | System and method for modeling and forecasting cyclical demand systems with dynamic controls and dynamic incentives | Jonathan R. M. Hosking, Ramesh Natarajan, Shivaram Subramanian, Xiaoxuan Zhang | 2020-04-21 |
| 10404067 | Congestion control in electric power system under load and uncertainty | Dung Phan | 2019-09-03 |
| 10282795 | Real-time forecasting of electricity demand in a streams-based architecture with applications | Jonathan R. M. Hosking, Ramesh Natarajan, Shivaram Subramanian, Xiaoxuan Zhang | 2019-05-07 |
| 9953117 | Planning economic energy dispatch in electrical grid under uncertainty | Dung Phan | 2018-04-24 |
| 9576327 | Managing time-substitutable electricity usage using dynamic controls | Jonathan R. Hosking, Ramesh Natarajan, Shivaram Subramaniam, Xiaoxuan Zhang | 2017-02-21 |
| 9563924 | Managing time-substitutable electricity usage using dynamic controls | Jonathan R. Hosking, Ramesh Natarajan, Shivaram Subramaniam, Xiaoxuan Zhang | 2017-02-07 |
| 9454449 | Data center physical infrastructure threshold analysis | Sugato Bagchi, Stacey Ramos | 2016-09-27 |
| 9260031 | Distributed charging of electrical assets | Dung Phan, Mayank Sharma, Chai Wah Wu, Jinjun Xiong | 2016-02-16 |
| 9058443 | Planning economic energy dispatch in electrical grid under uncertainty | Dung Phan | 2015-06-16 |
| 9058444 | Planning economic energy dispatch in electrical grid under uncertainty | Dung Phan | 2015-06-16 |
| 8949160 | Systems and methods for generating wind power scenarios for wind-power-integrated stochastic unit commitment problems | Jayant R. Kalagnanam, Ali Koc | 2015-02-03 |
| 8768742 | Assessment and rationalization of resiliency of data center strategies | Marek Petrik, Stacey Ramos | 2014-07-01 |
| 8732090 | Optimizing procurement spend compliance | Pawan R. Chowdhary, Amit Dhurandhar, Markus Ettl, Bruce C. Graves, William S. Schaefer +2 more | 2014-05-20 |
| 8635175 | Managing capacities and structures in stochastic networks | Antonius B. Dieker, Mark S. Squillante | 2014-01-21 |
| 8626353 | Integration of demand response and renewable resources for power generation management | Jayant R. Kalagnanam, Dmitriy A. Katz-Rogozhnikov, Mark S. Squillante, Xiaoxuan Zhang | 2014-01-07 |
| 8560291 | Data center physical infrastructure threshold analysis | Sugato Bagchi, Stacey Ramos | 2013-10-15 |
| 8494885 | Modeling distribution of emergency relief supplies for disaster response operations | Markus Ettl, Young-Min Lee | 2013-07-23 |
| 8355976 | Fast and accurate method for estimating portfolio CVaR risk | Pu Huang, Dharmashankar Subramanian, Jie Xu | 2013-01-15 |
| 8285649 | Heuristic cross shipping of disaster relief supplies at points of distribution | Markus Ettl, Young-Min Lee | 2012-10-09 |
| 8285409 | Effective cycle time management employing a multi-horizon model | Jayant R. Kalagnanam, Dmitriy A. Katz-Rogozhnikov, James R. Luedtke | 2012-10-09 |
| 7702411 | Integration of job shop scheduling with discreet event simulation for manufacturing facilities | Sugato Bagchi, Jayant R. Kalagnanam | 2010-04-20 |
| 7130712 | Method and system for small-lot orders to optimize production runs in the steel industry | Jayant R. Kalagnanam | 2006-10-31 |