MZ

Matthew H. Zemke

IBM: 25 patents #4,217 of 70,183Top 7%
📍 Rochester, MN: #239 of 3,042 inventorsTop 8%
🗺 Minnesota: #2,586 of 52,454 inventorsTop 5%
Overall (All Time): #163,519 of 4,157,543Top 4%
25
Patents All Time

Issued Patents All Time

Showing 1–25 of 25 patents

Patent #TitleCo-InventorsDate
10169807 Manufacturing adaptive order load for complex configure to order products Ivory Wellman Knipfer, Jason S. Lee, Antoine G. Sater 2019-01-01
10169737 Converting assets for reuse during manufacturing Steven C. Erickson, Ivory Wellman Knipfer, Jason S. Lee, Fraser Allan Syme 2019-01-01
10083416 Time phase work pool management for returned inventory asset routing Francis E. del Rosario, Kael B. Eddy, Clinton W. Erie, Ivory Wellman Knipfer 2018-09-25
9489651 Autonomic manufacturing operator authorization adjustment Hung Dao Bui, Ivory Wellman Knipfer, Eng Hin Koh, Ser Huay Tan 2016-11-08
9195954 Autonomic manufacturing operator authorization adjustment Hung Dao Bui, Ivory Wellman Knipfer, Eng Hin Koh, Ser Huay Tan 2015-11-24
9014827 Dynamically generating a manufacturing production work flow with selectable sampling strategies Steven C. Erickson, Ivory Wellman Knipfer, Jason S. Lee, Antoine G. Sater 2015-04-21
8949149 Attribute based inventory usage and stocking Francis E. del Rosario, Kael B. Eddy, Clinton W. Erie, Ivory Wellman Knipfer 2015-02-03
8352337 Automatic loaner part replacement to prevent system callback Fraser Allan Syme, William Robert Taylor 2013-01-08
8290606 Controlled cancellation for production flow and physical assets Ivory Wellman Knipfer 2012-10-16
8244644 Supply chain multi-dimensional serial containment process Ivory Wellman Knipfer, Jeffrey G. Komatsu, Jason S. Lee 2012-08-14
8165931 Automated purchase assembly conversion process to support a dynamic configure-to-order production operation Matthias Graefe, Lin Wang, Hao Xu 2012-04-24
8145336 Real-time assembly and part validation and auto-disposition Ivory Wellman Knipfer, Fraser Allan Syme 2012-03-27
8121910 Automatic loaner part replacement to prevent system callback Fraser Allan Syme, William Robert Taylor 2012-02-21
8108263 Method, system, and computer readable medium for grouping orders and creating short orders Ivory Wellman Knipfer, Jason S. Lee 2012-01-31
7937176 Hybrid part installation process combining mass part installation techniques with discrete part number assembly activities Ivory Wellman Knipfer, Jason S. Lee 2011-05-03
7920935 Activity based real-time production instruction adaptation Ivory Wellman Knipfer, Eng Hin Koh, Ser Huay Tan 2011-04-05
7840452 Application, method and process for managing part exchangeability across functional boundaries Ivory Wellman Knipfer, Fraser Allan Syme 2010-11-23
7818221 Method and apparatus for variable regulatory or conditional use compliance maximizing use of available inventory David John Fichtinger, Ivory Wellman Knipfer, Jason S. Lee, Fraser Allan Syme 2010-10-19
7716230 Multi-dimensional serial containment process Ivory Wellman Knipfer, Jeffrey G. Komatsu, Jason S. Lee 2010-05-11
7702544 Method for assisting selection of a build ahead configuration for use in supplying an ordered product Timothy Gerber, Ivory Wellman Knipfer, Thomas S. Mazzeo 2010-04-20
7680554 Method for associating objects in a manufacturing process Steven C. Erickson, Ivory Wellman Knipfer, Robert Noble Strong 2010-03-16
7610112 Method for manufacturing with engineering change override Ivory Wellman Knipfer, Fraser Allan Syme 2009-10-27
7437205 Method for manufacturing with engineering change override Ivory Wellman Knipfer, Fraser Allan Syme 2008-10-14
7333870 Self-adjusting inventory management process for personalizing and re-personalizing parts Ivory Wellman Knipfer, John Walter Marreel 2008-02-19
7269474 Controlled self-adjusting process for reducing selected dimensions of electronic products Ivory Wellman Knipfer 2007-09-11