| 12514103 |
Flexible substrate, display panel and method for manufacturing the same |
Yubao GUO, Weihong Xia, Jianbing Li, Tao Gao, Wenfeng Zhou |
2025-12-30 |
|
| 12505763 |
Attachment fixture, attachment device and attachment method |
Mengyuan PANG, Changan Yang, Yantao Yang, Cheen Liao, Yaning Wang |
2025-12-23 |
|
| 12495500 |
Flexible display module and manufacturing method thereof |
Jishu Shi, Changbo Liu, Zuqiang Wang, Qiongqi Wang, Chao Zhou +3 more |
2025-12-09 |
|
| 12481322 |
Display panel and manufacturing method therefor, and display device |
Zuqiang Wang, Yonghui Jiang, Jishu Shi, Qiongqi Wang, Chao Zhou +3 more |
2025-11-25 |
|
| 12471485 |
Display panel and preparation method therefor, and display apparatus |
Yaning Wang, Mengyuan PANG |
2025-11-11 |
|
| 12464913 |
Display apparatus and manufacturing method thereof |
Jishu Shi, Xuewei TIAN, Chenchen LIU, Yubao GUO, Xiangjun Ding |
2025-11-04 |
|
| D1071167 |
Bayonet plunger engagement member |
— |
2025-04-15 |
|
| D1058498 |
Pump holding clip with battery charging capability |
— |
2025-01-21 |
|
| 12197483 |
Enterprise-level classification of data-items in an enterprise repository and prevention of leakage of personally identifiable information (PII) |
Peter Shmukler, Amit Cohen, Nir Zinger |
2025-01-14 |
|
| D1039138 |
Snap fit plunger rod |
— |
2024-08-13 |
|
| D1038387 |
Bayonet plunger rod |
— |
2024-08-06 |
|
| D1032833 |
Bayonet plunger release member |
— |
2024-06-25 |
|
| D1032831 |
Snap fit plunger release member |
— |
2024-06-25 |
|
| D1032832 |
Snap fit plunger engagement member |
— |
2024-06-25 |
|
| 11256584 |
One-step disaster recovery configuration on software-defined storage systems |
Zah Barzik, Eli Koren, Rivka M. Matosevich, Alexander Snast |
2022-02-22 |
$13,349,000 |
| 11243899 |
Forced detaching of applications from DMA-capable PCI mapped devices |
Constantine Gavrilov, Alexander Snast |
2022-02-08 |
$4,353,000 |
| 11226875 |
System halt event recovery |
Daniel Gan-Levi, Ronen Gazit, Deborah A. Messing |
2022-01-18 |
$5,274,000 |
| 11221927 |
Method for the implementation of a high performance, high resiliency and high availability dual controller storage system |
Daniel Gan-Levi, Ronen Gazit, Ofer Leneman, Deborah A. Messing |
2022-01-11 |
$4,843,000 |
| 11190444 |
Configuration mechanisms in a switchless network |
Gregory Etelson, Constantine Gavrilov |
2021-11-30 |
$2,996,000 |
| 11165653 |
Node discovery mechanisms in a switchless network |
Gregory Etelson, Constantine Gavrilov |
2021-11-02 |
$2,126,000 |
| 11074227 |
ID management for a network attached storage system |
Dan Cohen, Daniel Gan-Levi, Shai M. Koffman, Nimrod Sapir |
2021-07-27 |
$4,187,000 |
| 10904132 |
Method, system, and computer program product for configuring an attribute for propagating management datagrams in a switchless network |
Gregory Etelson, Constantine Gavrilov |
2021-01-26 |
$1,788,000 |
| 10901979 |
Generating responses to queries based on selected value assignments |
Meir Kalech, Dennis Potashnik, Ron Zvi Stern |
2021-01-26 |
$1,788,000 |
| 10831398 |
Storage device efficiency during data replication |
Zah Barzik, Maxim Kalaev, Deborah A. Messing |
2020-11-10 |
$848,000 |
| 10826785 |
Data traffic monitoring tool |
Jonathan Amit, Vladislav Drouker, Osnat Shasha |
2020-11-03 |
$4,313,000 |