TG

Tommy Frank Grigsby

HS Halliburton Energy Services: 21 patents #283 of 4,711Top 7%
HA Halliburton: 2 patents #318 of 857Top 40%
HS Haliburton Energy Sercices: 1 patents #3 of 38Top 8%
📍 Houston, TX: #750 of 21,073 inventorsTop 4%
🗺 Texas: #5,391 of 125,132 inventorsTop 5%
Overall (All Time): #174,376 of 4,157,543Top 5%
24
Patents All Time

Issued Patents All Time

Showing 1–24 of 24 patents

Patent #TitleCo-InventorsDate
9494000 Methods of maintaining sufficient hydrostatic pressure in multiple intervals of a wellbore in a soft formation Bruce Techentien 2016-11-15
8919439 Single trip multi-zone completion systems and methods William Mark Richards 2014-12-30
8746337 Single trip multi-zone completion systems and methods William Mark Richards 2014-06-10
8706463 System and method for completion optimization Jason D. Dykstra, Kenneth L. Schwendemann, Orlando DeJesus, Michael Linley Fripp, Syed Hamid 2014-04-22
8596359 Remotely controllable fluid flow control assembly Timothy R. Tips 2013-12-03
8499827 Sand control screen assembly and method for use of same Ronald Glen Dusterhoft, Kim Vance Thornton, Carl Bismark Ferguson, Floyd R. Simonds, William Mark Richards +1 more 2013-08-06
8291972 Sand control screen assembly and method for use of same Ronald Glen Dusterhoft, Kim Vance Thornton, Carl Bismark Ferguson, Floyd R. Simonds, William Mark Richards +1 more 2012-10-23
7866383 Sand control screen assembly and method for use of same Ronald Glen Dusterhoft, Kim Vance Thornton, Carl Bismark Ferguson, Floyd R. Simonds, William Mark Richards 2011-01-11
7866405 Securement of lines to well sand control screens William Mark Richards 2011-01-11
7814973 Sand control screen assembly and method for use of same Ronald Glen Dusterhoft, Kim Vance Thornton, Carl Bismark Ferguson, Floyd R. Simonds, William Mark Richards +1 more 2010-10-19
7556093 Downhole fiber optic wet connect and gravel pack completion Bruce Techentien, David Henderson, Bryon Mullen 2009-07-07
7228898 Gravel pack completion with fluid loss control fiber optic wet connect Bruce Techentien 2007-06-12
7191832 Gravel pack completion with fiber optic monitoring Bruce Techentien 2007-03-20
7165892 Downhole fiber optic wet connect and gravel pack completion Bruce Techentien, David Henderson, Bryon Mullen 2007-01-23
7108083 Apparatus and method for completing an interval of a wellbore while drilling Floyd R. Simonds, Morris W. Cox, Terry Dailey, Tommie A. Freeman, Jiten Chatterji +8 more 2006-09-19
6868913 Apparatus and methods for installing casing in a borehole William Launey Vidrine, Ian Phillips 2005-03-22
6766862 Expandable sand control device and specialized completion system and method Jiten Chatterji, R. Ashley Donaldson, Ronald Glen Dusterhoft, Travis Hailey, Jackie M. LaFontaine +4 more 2004-07-27
6601646 Apparatus and method for sequentially packing an interval of a wellbore Steven G. Streich 2003-08-05
6564870 Method and apparatus for completing wells with expanding packers for casing annulus formation isolation Sanjay Vitthal 2003-05-20
6543545 Expandable sand control device and specialized completion system and method Jiten Chatterji, R. Ashley Donaldson, Ronald Glen Dusterhoft, Travis Hailey, Jackie M. LaFontaine +4 more 2003-04-08
6491104 Open-hole test method and apparatus for subterranean wells Curtis Len Wilie, Jackie M. LaFontaine 2002-12-10
6349772 Apparatus and method for hydraulically actuating a downhole device from a remote location Bryon Mullen 2002-02-26
5404955 Releasable running tool for setting well tool Ralph H. Echols, Dhirajlal C. Patel 1995-04-11
5343953 Through-tubing recirculating tool assembly for well completions Dhirajlal C. Patel 1994-09-06