Issued Patents All Time
Showing 1–21 of 21 patents
| Patent # | Title | Co-Inventors | Date |
|---|---|---|---|
| 12292729 | Method for equipment control | Mikko Jaaskelainen, Ian Bradford Mitchell | 2025-05-06 |
| 12078060 | Fracturing control | William Owen Alexander Ruhle, Ronald Glen Dusterhoft, Ajish Potty | 2024-09-03 |
| 11939864 | Cluster efficiency operation control | William Owen Alexander Ruhle, Ronald Glen Dusterhoft, Ajish Potty | 2024-03-26 |
| 11933161 | Determining wellbore parameters through analysis of the multistage treatments | Vladimir Nikolayevich Martysevich, Tyler Austen Anderson, Srinath Madasu | 2024-03-19 |
| 11934180 | Method for equipment control | Mikko Jaaskelainen, Ian Bradford Mitchell | 2024-03-19 |
| 11879317 | Flow rate optimization during simultaneous multi-well stimulation treatments | Timothy Holiman Hunter, Stanley V. Stephenson, Mikko Jaaskelainen, Ubong Inyang, Tirumani N. Swaminathan | 2024-01-23 |
| 11675336 | Method for equipment control | Mikko Jaaskelainen, Ian Bradford Mitchell | 2023-06-13 |
| 11619115 | Real-time monitoring and control of diverter placement for multistage stimulation treatments | Tyler Austen Anderson, Aaron Gene Russell, Srinath Madasu, Karan Dhuldhoya, Ubong Inyang | 2023-04-04 |
| 11513500 | Method for equipment control | Mikko Jaaskelainen, Ian Bradford Mitchell | 2022-11-29 |
| 11449645 | Calibrating a diversion model for a hydraulic fracturing well system | Seyed Omid Razavi, Tirumani N. Swaminathan, Baidurja Ray | 2022-09-20 |
| 11421528 | Fracture complexity operation control | William Owen Alexander Ruhle, Ronald Glen Dusterhoft, Ajish Potty | 2022-08-23 |
| 11408259 | Real-time monitoring and control of diverter placement for multistage stimulation treatments | Chaitanya Mallikarjun Karale | 2022-08-09 |
| 11306572 | Hydraulic fracturing modelling and control | William Owen Alexander Ruhle, Ronald Glen Dusterhoft, Ajish Potty | 2022-04-19 |
| 11199068 | Real-time perforation plug deployment and stimulation in a subsurface formation | Ubong Inyang, Tyler Austen Anderson, Jim B. Surjaatmadja | 2021-12-14 |
| 11187074 | Determining wellbore parameters through analysis of the multistage treatments | Vladimir Nikolayevich Martysevich, Tyler Austen Anderson, Srinath Madasu | 2021-11-30 |
| 11162346 | Real-time perforation plug deployment and stimulation in a subsurface formation | Janette Cortez Montalvo, Ubong Inyang, Tyler Austen Anderson, Jim B. Surjaatmadja | 2021-11-02 |
| 11143005 | Electric pump flow rate modulation for fracture monitoring and control | Ronald Glen Dusterhoft, Stanley V. Stephenson, Timothy Holiman Hunter | 2021-10-12 |
| 11105188 | Perforation tool and methods of use | Mikko Jaaskelaninen, Eric Davis, Henry Clifford Bland | 2021-08-31 |
| 11041382 | Vector strain sensor system for a wellbore | Henry Clifford Bland, Mikko Jaaskelainen, Tirumani N. Swaminathan, Eric Davis | 2021-06-22 |
| 10241232 | Geomechanical and geophysical computational model for oil and gas stimulation and production | Avi Lin, Dinesh Ananda Shetty, Jie Bai, Srinath Madasu | 2019-03-26 |
| 9739907 | Optimizing a grid for finite element solutions for subterranean region simulations | Avi Lin | 2017-08-22 |