| 12480277 |
Systems and methods for controlling a digging and dumping machine |
Benjamin J. Hodel, Adam Nackers, Justin L. Steinlage |
2025-11-25 |
|
| 12410586 |
Systems and methods for collision avoidance for shape changing machines |
Jun Zuo, Jacob C. Maley, Manoj Pothugunti |
2025-09-09 |
|
| 12385227 |
System and method for monitoring work area |
— |
2025-08-12 |
|
| 12223837 |
Systems and methods for detecting false positives in collision notifications |
Jun Zuo |
2025-02-11 |
|
| 11549235 |
System and method for controlling operation of a machine |
— |
2023-01-10 |
|
| 11378964 |
Systems and methods for autonomous movement of material |
— |
2022-07-05 |
$118,765,000 |
| 11118453 |
System and method of layering material |
— |
2021-09-14 |
$44,113,000 |
| 10975546 |
System and method of layering material |
— |
2021-04-13 |
$120,585,000 |
| 10858801 |
System for controlling operation of a machine |
Troy K. Becicka |
2020-12-08 |
$84,725,000 |
| 10794039 |
System and method for controlling the operation of a machine |
Brian G. Funke, Paul D. Lenzen |
2020-10-06 |
$54,224,000 |
| 10774506 |
System and method for controlling the operation of a machine |
— |
2020-09-15 |
$52,687,000 |
| 10669693 |
System and method for controlling a machine through an interrupted operation |
— |
2020-06-02 |
$48,519,000 |
| 10640952 |
System and method for modifying a material movement plan |
Seth J. Redenbo, Troy K. Becicka, Kyle Edwards, Michael Taylor |
2020-05-05 |
$21,658,000 |
| 10552775 |
System and method for optimizing a material moving operation |
— |
2020-02-04 |
$87,030,000 |
| 10474155 |
System and method for material disposal |
— |
2019-11-12 |
$28,152,000 |
| 10472803 |
System and method for determining stale terrain value of worksite |
— |
2019-11-12 |
$28,152,000 |
| 10407872 |
System and method for controlling earthmoving machines |
Mikael Holmqvist, Michael Taylor, Kyle Edwards, Brian G. Funke, Seth J. Redenbo |
2019-09-10 |
$24,546,000 |
| 10407877 |
Method and system for controlling a machine operating at a worksite |
— |
2019-09-10 |
$24,546,000 |
| 10407878 |
System and method for dumping material |
— |
2019-09-10 |
$24,546,000 |
| 10248127 |
Systems and methods for pile spacing |
Michael Taylor, Steven E. Empson |
2019-04-02 |
$21,232,000 |
| 10208453 |
Methods and systems for monitoring work zone in worksite |
Michael Taylor, Steven E. Empson |
2019-02-19 |
$36,968,000 |
| 10186004 |
System and method for evaluating a material movement plan |
Michael Taylor, Thandava K. Edara |
2019-01-22 |
$26,065,000 |
| 10101723 |
System and method for optimizing a work implement path |
Michael Taylor, Thandava K. Edara |
2018-10-16 |
$88,413,000 |
| 9909284 |
Missed cut detection and reaction |
James DeVore, Thandava K. Edara, Michael Taylor, Kenneth L. Stratton |
2018-03-06 |
$34,250,000 |
| 9803336 |
System and method for determining dump locations |
Michael Taylor |
2017-10-31 |
$16,011,000 |