| 12512886 |
Beamforming and interference mitigation techniques for massive MIMO uplink and downlink in O-RAN 7-2 compatible base stations |
Neelam Chandwani, Thushara Hewavithana, Pei-Ying Lu, Bishwarup Mondal, Michael Paul Beadle +1 more |
2025-12-30 |
|
| 12432594 |
Inter-cell beam management for 5G systems |
Guotong Wang, Alexei Davydov, Bishwarup Mondal |
2025-09-30 |
|
| 12418443 |
Demodulation reference signal transmission from multiple base stations |
Bishwarup Mondal, Alexei Davydov, Sameer Pawar |
2025-09-16 |
|
| 12402146 |
System and method for DMRS antenna port indication for URLLC |
Debdeep Chatterjee, Fatemeh Hamidi-Sepehr |
2025-08-26 |
|
| 12389397 |
Aperiodic CSI-RS resource set triggering by DCI with aperiodic triggering offset |
Guotong Wang, Alexei Davydov, Bishwarup Mondal |
2025-08-12 |
|
| 12348442 |
User equipment processing time relaxation for multi-DCI NC-JT PDSCH reception |
Bishwarup Mondal, Debdeep Chatterjee, Alexei Davydov |
2025-07-01 |
|
| 12308932 |
Technologies for beam switching to receive downlink repetitions |
Bishwarup Mondal, Yushu Zhang, Alexei Davydov |
2025-05-20 |
|
| 12301337 |
Random DMRS sequence generation in NR uplink |
Guotong Wang, Alexei Davydov, Sameer Pawar, Gregory Morozov, Yushu Zhang |
2025-05-13 |
|
| 12245252 |
Default PDSCH beam setting and PDCCH prioritization for multi panel reception |
Bishwarup Mondal, Alexei Davydov |
2025-03-04 |
|
| 12238025 |
Systems and methods for mapping transmission configuration indication (TCI) state and demodulation reference signal (DMRS) ports groups |
Yushu Zhang, Bishwarup Mondal, Alexei Davydov, Guotong Wang |
2025-02-25 |
|
| 12238029 |
Collision handling of reference signals |
Debdeep Chatterjee, Alexei Davydov, Seung Hee Han, Jeongho Jeon, Sameer Pawar +2 more |
2025-02-25 |
|
| 12232123 |
Generation node b (GNB) configured for slot-less operation at frequencies above a 52.6 GHz carrier frequency |
Gang Xiong, Alexei Davydov, Dae Won Lee, Yingyang Li, Salvatore Talarico |
2025-02-18 |
|
| 12192997 |
System and method for UE processing time relaxation for multi-TRP transmission |
Bishwarup Mondal, Debdeep Chatterjee, Alexei Davydov |
2025-01-07 |
|
| 12114321 |
Preemption indication for multi-TRP transmission |
Bishwarup Mondal, Toufiqul Islam, Hong He |
2024-10-08 |
$261,024,000 |
| 12088516 |
Resource allocation for multi-TRP URLLC |
Bishwarup Mondal, Debdeep Chatterjee, Alexei Davydov, Yushu Zhang |
2024-09-10 |
$233,602,000 |
| 12075433 |
Physical resource block bundling in multi-TRP operation |
Yushu Zhang, Alexei Davydov, Bishwarup Mondal, Guotong Wang |
2024-08-27 |
$283,265,000 |
| 12068996 |
Low peak-to-average demodulation reference signal design for physical uplink control channel |
Alexei Davydov, Sameer Pawar, Guotong Wang, Gregory Morozov |
2024-08-20 |
$206,773,000 |
| 12047218 |
Physical downlink control channel monitoring and rate matching for remaining minimum system information in new radio unlicensed |
Bishwarup Mondal, Debdeep Chatterjee, Yongjun Kwak, Dae Won Lee |
2024-07-23 |
$287,558,000 |
| 12047950 |
Aperiodic CSI-RS resource set triggering by DCI with aperiodic triggering offset |
Guotong Wang, Alexei Davydov, Bishwarup Mondal |
2024-07-23 |
$20,446,000 |
| 12040999 |
Sounding reference signal (SRS) transmission framework |
Alexei Davydov, Sameer Pawar |
2024-07-16 |
$239,464,000 |
| 12035327 |
System and method for DMRS antenna port indication for URLLC |
Debdeep Chatterjee, Fatemeh Hamidi-Sepehr |
2024-07-09 |
$250,204,000 |
| 11996967 |
Low peak-to-average power ratio (PAPR) reference signal (RS) design for high frequency bands |
Alexei Davydov |
2024-05-28 |
$30,739,000 |
| 11930479 |
PUCCH and PDSCH in multiplexed NR applications |
Bishwarup Mondal, Gang Xiong, Alexei Davydov, Sergey Panteleev, Debdeep Chatterjee |
2024-03-12 |
$37,196,000 |
| 11930465 |
Long transmission duration for wireless systems |
Gang Xiong, Yushu Zhang, Jie Zhu, Dae Won Lee, Alexei Davydov +1 more |
2024-03-12 |
$37,196,000 |
| 11903069 |
Beam failure recovery in secondary cells |
Alexei Davydov, Bishwarup Mondal |
2024-02-13 |
$18,546,000 |