| 11638368 |
Incremental data center infrastructure commissioning |
Antonio William Vasquez Ramirez, Matthew Thomas Phillips |
2023-04-25 |
| 10476298 |
Elevated automatic transfer switch cabinet |
Peter George Ross |
2019-11-12 |
| 10334758 |
Process for incrementally commissioning mechanical infrastructure in a data center |
Antonio William Vasquez Ramirez, Matthew Thomas Phillips |
2019-06-25 |
| 10198056 |
Flexible power support redundancy busway system |
— |
2019-02-05 |
| 9983248 |
Incremental data center infrastructure commissioning |
Antonio William Vasquez Ramirez, Robert David Wilding, Richard Chadwick Towner |
2018-05-29 |
| 9939790 |
Variable rate rack installation |
Paul Andrew Churnock, Robert David Wilding |
2018-04-10 |
| 9857855 |
Redundant secondary power support system |
— |
2018-01-02 |
| 9778717 |
Flexible power support redundancy busway system |
— |
2017-10-03 |
| 9537291 |
Elevated automatic transfer switch cabinet |
Robert David Wilding, Peter George Ross, John William Eichelberg |
2017-01-03 |
| 9437387 |
Tap box assembly with separated annunciator |
Brock Robert Gardner |
2016-09-06 |